Flood Mitigation System

SKU: FloodSystem
Call for Pricing
  • Flood Mitigation System
  • Flood Mitigation System

Is Performance Tested

  • Tested by U.S. Army Corps of Engineers to their “Standardized Testing Protocol for Evaluation of Expedient Floodfighting Structures”.
  • Retains up to 36″ of water with minimal seepage.
  • Tested configurations for pavement and soil.

Requires Minimal Assembly and Components

  • Rapidly deployable system saves time & manpower.
  • One barrier section replaces roughly 300 sandbags.
  • Environmentally-friendly barriers are reusable and 100% recyclable.
  • Easily removed post-incident with no waste or contamination issues.

Has Multi-Purpose Functionality

  • Can be used year-round.
  • DOT-approved Type III road closures and barricades.
  • Delineate & secure evacuation routes.
  • Disaster relief station perimeters & crowd control.

Superior Functionality vs. Sandbags

  • Assembly is 16 times faster.
  • Seepage rate is 50% lower.
  • Cost per foot is 50% less than comparable sandbag floodwall.